Size: 1253
Comment:
|
Size: 1468
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 7: | Line 7: |
abstract: [[attachment:acoustic-elevator | Acoustic Elevator ]] | complete abstract here: [[attachment:acoustic-elevator | Acoustic Elevator ]] ''(unformatted plain text)'' |
Line 9: | Line 9: |
Vibration power in the stiff tether itself (2013 IAA study) can provide 20+ megawatts of power to resonant wheels connected by adaptive motors, which can lift 14 tonnes of payload off the surface at up to 140 meters per second. | brief abstract: Vibration power in the stiff tether itself (2013 IAA study) can provide 20+ megawatts of power to resonant wheels driving electronically-switched adaptive motors, which can lift 14 tonnes of payload off the surface at up to 140 meters per second. |
Line 15: | Line 16: |
abstract: [[ attachment:launchloop2.0 | Launch Loop 2.0]] | complete abstract here: [[ attachment:launchloop2.0 | Launch Loop 2.0 ]] ''(unformatted plain text)'' |
Line 17: | Line 18: |
Combining the best of the space elevator with old and new launch loop developments. Surface logistics like the space elevator. A 70 km Kevlar tether to a surface-powered electromechanical 11 km/s launcher, then a 5 hour trajectory to a rotating Kevlar capture tether in geosynchronous orbit. 320 tonnes per day with a minimum 500 MW power supply, 9600 tonnes per day with a 6 GW power supply, which can be provided by space power satellites. Can be built with off-the-shelf materials. | brief abstract: Combining the best of the space elevator with old and new launch loop developments. Surface logistics like the space elevator. A 70 km Kevlar tether to a surface-powered electromechanical 11 km/s launcher, then a 5 hour trajectory to a rotating Kevlar capture tether in geosynchronous orbit. 320 tonnes per day with a minimum 500 MW power supply, 9600 tonnes per day with a 6 GW power supply, which can be provided by space power satellites. Can be built with off-the-shelf materials. |
Line 20: | Line 21: |
The presentation will focus on linear motor design and simulation tools |
Abstracts for SE2107
Work in progress, waiting for the submission system to be set up. I will keep updating the abstracts, and add papers and illustrations as they are written.
complete abstract here: Acoustic Elevator (unformatted plain text)
brief abstract: Vibration power in the stiff tether itself (2013 IAA study) can provide 20+ megawatts of power to resonant wheels driving electronically-switched adaptive motors, which can lift 14 tonnes of payload off the surface at up to 140 meters per second.
Some 2-weeks-outdated work here.
complete abstract here: Launch Loop 2.0 (unformatted plain text)
brief abstract: Combining the best of the space elevator with old and new launch loop developments. Surface logistics like the space elevator. A 70 km Kevlar tether to a surface-powered electromechanical 11 km/s launcher, then a 5 hour trajectory to a rotating Kevlar capture tether in geosynchronous orbit. 320 tonnes per day with a minimum 500 MW power supply, 9600 tonnes per day with a 6 GW power supply, which can be provided by space power satellites. Can be built with off-the-shelf materials.
Uses VASIMR electric rocket engines and some atmospheric argon propellant to add angular momentum at GEO.
The presentation will focus on linear motor design and simulation tools