Size: 1665
Comment:
|
Size: 1665
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 21: | Line 21: |
[[ attachment:SledRelease.ods | SledRelease.ods LibreOffice Calc attachment ]] | [[ attachment:SledRelease.ods | SledRelease.ods ]] LibreOffice Calc attachment |
Vehicle Exit From Sled Into Orbit
SledVehicleExit
At the end of the acceleration run, the vehicle stops accelerating, separates from the sled, and enters a departure orbit, while the sled continues to accelerate at 3 gees until it reaches the top of the loop.
Vehicle acceleration does not end abruptly from 3 gees; the horizontal acceleration reduces smoothly from 3 gees to zero gees over one second, a "jerk" of 30 m/s³. If the vehicle and sled are moving faster than orbital velocity, there will be some upwards acceleration force as well, which is relieved towards the end of the "jerk", stretching the "one second" deployment time a little; 52 msec for a one gee upwards deployment force at escape velocity.
A table of vehicle acceleration and sled-relative position:
inertial |
|
sled-relative |
|||||
velocity |
displacement |
||||||
ax |
ay |
a |
time |
vx |
vy |
x |
y |
m/s² |
m/s² |
m/s² |
sec |
m/s |
m/s |
meters |
meters |
30.0 |
10.0 |
31.6 |
0.000 |
0.0 |
0.0 |
0.00 |
0.00 |
25.0 |
10.0 |
26.9 |
0.157 |
-0.4 |
0.0 |
-0.02 |
0.00 |
20.0 |
10.0 |
22.4 |
0.309 |
-1.5 |
0.0 |
-0.16 |
0.00 |
15.0 |
10.0 |
18.0 |
0.453 |
-3.3 |
0.0 |
-0.50 |
0.00 |
10.0 |
10.0 |
14.1 |
0.583 |
-5.6 |
0.0 |
-1.07 |
0.00 |
5.0 |
5.0 |
7.1 |
0.818 |
-10.9 |
0.6 |
-2.99 |
0.05 |
0.0 |
0.0 |
0.0 |
1.054 |
-17.4 |
2.4 |
-6.30 |
0.37 |
SledRelease.ods LibreOffice Calc attachment