## page was renamed from EvacuatedTubeTransport #format jsmath = Evacuated Tube Transport = [[http://et3.com]] proposes maglev vehicles in long vacuum tubes for intercity transport. Accelerating vehicles to very high speeds with coil guns is [[MassDriver | expensive ]], so even though a launch loop without energy recovery wastes about 2.4x the kinetic energy of the vehicle, an in-tube loop accelerator will probably be much cheaper than a lot of switching electronics. Assuming [[http://en.wikipedia.org/wiki/Transrapid|2kW/tonne]] for levitation power P, 8300km between San Francisco and Tokyo, and a maximum acceleration of 10 m/s^2^. For an acceleration and deceleration time of t,,a,, the maximum velocity is 10t,,a,, and the trip time is t,,a,, + d/10t,,a,,. The energy used for a trip is E = 2(t,,a,, + d/10t,,a,,)+12t,,a,,^2^ joules per kilogram. Assuming 500kg/passenger, and $0.20 per kilowatt hour, the trip looks like so, versus varying acceleration times: ||accel time||vmax||trip time s||trip time hr|| E accel || E lev || E total ||$/passgr|| || 20 || 200||41520.00 || 11.53 || 4800.00||83040.00|| 87840.00|| 2.44 || || 40 || 400||20790.00 || 5.78 || 19200.00||41580.00|| 60780.00|| 1.69 || || 41 || 410||20284.90 || 5.63 || 20172.00||40569.80|| 60741.80|| 1.69 || || 60 || 600||13893.33 || 3.86 || 43200.00||27786.67|| 70986.67|| 1.97 || || 100 ||1000|| 8400.00 || 2.33 || 120000.00||16800.00|| 136800.00|| 3.80 || || 150 ||1500|| 5683.33 || 1.58 || 270000.00||11366.67|| 281366.67|| 7.82 || || 200 ||2000|| 4350.00 || 1.21 || 480000.00|| 8700.00|| 488700.00|| 13.58 || || 300 ||3000|| 3066.67 || 0.85 ||1080000.00|| 6133.33||1086133.33|| 30.17 || || 400 ||4000|| 2475.00 || 0.69 ||1920000.00|| 4950.00||1924950.00|| 53.47 || || 600 ||6000|| 1983.33 || 0.55 ||4320000.00|| 3966.67||4323966.67|| 120.11 || [[attachment:ETT.ods|libreoffice spreadsheet source]] . . . . [[http://www.libreoffice.org/download/|libreoffice download]] ----- The pollution cost will vary by the source of grid energy, and ticket costs will include operating expense, amortization of infrastructure, and profits. Given the $\$\$\$\$\$\$\$\$$ cost of infrastructure, a loop-driven ETT system won't happen soon.